Brine Decantation Unit

Company / Location:

Química del Cinca
Monzón, Huesca

Details:

Manufacture and assembly of brine settling unit.

Material: carbon steel painted inside and outside. Outer diameter: 7m. Total height: 5.38m. Conical bottom with a 15% slope. Flat top cover made of fiberglass reinforced plastic (FRP).

It is composed of the container itself; internal: internal mixing chamber, engine with mixing turbine, motor and bottom sweeper shaft; Central platform with maintenance walkway at the top and helical perimeter access ladder, both with GRP tramex; toothed manifold on the upper perimeter, flocculant distributor with connecting pipes and manhole accessible from the ground where it is installed. Exterior heat-up.

Other Projects

Manufacture of ducts and equipment for two gas treatment plants
Design and manufacture of three soda tanks for a 55 MW geothermal project
50% soda tank